Academy

Learn the craft of project controls.

Short, interactive guides on how P6 and CPM scheduling actually work — built to click through, not just read.

Foundation
What Is CPM and How Does P6 Calculate It?
Step through a 4-activity network's forward and backward pass, one activity at a time.
~8 min · Interactive
Foundation
Total Float Explained — and Why Planners Argue About It
Drag a slider and watch float collapse to zero, then negative. See how P6's float type setting changes the number.
~6 min · Interactive
Intermediate
Critical Path vs Longest Path
Toggle between CT_TotFloat and CT_DrivPath on the same network and see exactly where they disagree.
~5 min · Interactive
Foundation
The Data Date: The Most Important Field Most Planners Set Wrong
Scrub a data date across a six-activity programme, and toggle retained logic vs progress override.
~5 min · Interactive
Foundation
How to Read a P6 XER File — It's Just Text
Click through an annotated XER snippet, line by line, to see exactly what each part means.
~7 min · Interactive