Excavation volume, spoil volume after bulking, and estimated truck loads — with optional battered sides.
Excavation Area—
Excavation Volume—
Spoil Volume (bulked)—
Truck Loads—
Battered volume uses the frustum (truncated pyramid) formula between the bottom and top excavation areas. Bulking factor is a typical assumption for the selected material — verify against your own geotechnical report.